Urban | DCCM has completed the design and construction administration of a tri-plex 2,200 GPM Lift Station and 16” force main located on Padre Island for the city of Corpus Christi. The 15.5-ft diameter 31-ft deep masterplan lift station also includes a biofilter for odor control, an emergency generator for backup power, a shade structure to cover the control panel and 5,200-ft of 16-inch force main installed by open trenching and horizontal directional boring.
Whether initiating groundbreaking projects or seeking inventive solutions, our collaborative spirit ensures the success of your ventures.
Urban | DCCM is now part of a single, streamlined DCCM brand. You’ll find all the same expertise and project experience at www.DCCM.com.
This site will be sunset soon, so be sure to update your links.